Monday, May 5, 2014

Why does going to Amherst require a transfer?

This past weekend, I was trying to get from Hartford to Amherst. This should be a reasonably easy trip. Peter Pan Bus runs about a dozen trips daily between Hartford and Springfield and eight between Springfield and Amherst. I went looking for tickets, figuring that at least some of those trips would be through-runs. All required a transfer in Springfield. Which is odd, because to get from Boston to Amherst—except for Fridays and Sundays during the academic year—also requires a transfer.

It got me to thinking: can you get to Amherst by bus from anywhere further than Springfield without a transfer at the decrepit-if-soon-to-be-replaced Springfield bus station? It took some reverse engineering of the bus schedules (update: somewhat available in PDF here), but I am pretty sure the answer is a resounding "no."

This is a problem. It is an issue both in the time it takes to get from Boston to Amherst with a transfer—generally more than three hours for a drive which would be a direct trip of 1:45—and the psychological effect that people do not like to have to transfer (especially if they have to sit in a post-apocalyptic bus station that hasn't seen a broom since the mid-'70s). There is research about transfer penalties in transit, and it is likely that this carries over to intercity bus travel as well.

Amherst to Boston should be a strong bus market, even at times when undergraduate students aren't decamping for home on the weekend. Amherst to New York City should also be a well-traveled route. In theory, one bus could start in Amherst and run to Springfield an on to Boston in 2:00, with a transfer available to Hartford and New York. In practice, there is minimal schedule coordination, and every passenger is required to get off of one bus, wait in the bus terminal, and get on to another. By imposing a penalty which doubles the travel time (to Boston) and requires a transfer at a substandard bus station, it discourages students to use the bus system, and indirectly encourages them to use a private automobile, despite $4 gas and tolls.

I ran some times for these routes on a weekday (I chose May 7). The average transfer time for a Boston-to-Amherst trip is 27 minutes. The average transfer for a New York/Hartford-to-Amherst trip is 40 minutes. Departing Amherst the transfer times are a bit better: 20 minutes to Boston and 28 to Hartford/New York. But it still incurs a significant time penalty, and a significant issue of not having through service.

There is a model for this sort of service: Concord Coach's service from Boston and Logan airport to Portland Maine and beyond. Several times a day, two buses leave Boston and Logan and run to Portland. Since the market beyond Portland is smaller, only one bus is needed to go beyond Portland to Augusta and Bangor. The bus which originates in Boston runs through, and passengers coming from Logan and who wish to go beyond Boston get off one bus and on to the other. The transfers are timed for minimal delays, and the buses will wait for each other if one is running late.

Peter Pan's service could mirror this from Amherst. Buses would leave Boston and run to Springfield, a major market. At the same time, buses from New York to Springfield would be coordinated to arrive a few minutes before the Boston bus. Those passengers would still transfer if they wanted to travel beyond Springfield—and a few minutes of schedule padding could be built in due to traffic conditions south of Hartford (with more frequent service to come on the New Haven-Hartford-Springfield rail corridor, train services could be synched with bus service as well). Boston passengers to Amherst would stay on the bus, and instead of a 10 to 30 minute transfer, it would necessitate a five minute stop.

This would mean that passengers from Boston to Amherst would see significantly shorter trips and would no longer have to move from one bus to another. If Peter Pan claims that there is not enough demand for the market, perhaps it is because their service is substandard on the route. For anyone who has taken a bus to Amherst it's a joke that you have to change in Springfield. In reality, it is a detriment to service.

A major stakeholder in this should be the Commonwealth of Massachusetts. They operate, in Amherst, a major research and educational institution, which should have strong ties to Boston. There's no direct highway access to UMass; driving between the two requires an indirect trip via Springfield and Northampton, or a narrow road from Palmer. The state also, through it's BusPlus+ program, subsidizes Peter Pan routes, buying buses for the operator in exchange for Peter Pan's operation of commuter routes. MassDOT should, as part of this relationship, encourage Peter Pan to run direct service between Amherst and the three largest cities in the state: Boston, Worcester and Springfield. Not doing so is a disservice not only to the traveling public, but also to the state's major public university. It's nonsensical that you can't get on a bus in Amherst and get to Boston. That could—and should—change.

Tuesday, April 29, 2014

What's wrong with this picture?

A simple question: What is wrong with this picture?


The answer: the cars have a green light to go straight, but the pedestrians have to wait. This signal is optimized for vehicle movement, at the expense of the safety and convenience of pedestrians. Considering that this is an area with high pedestrian use—at the northern end of the BU Bridge along the Paul Dudley White bike path—it is nonsensical that such priority is given to vehicles rather than pedestrians. The only way to get a "walk" light is to push the "beg button" on either side of the crosswalk—otherwise the light stays at "don't walk" encouraging drivers to make the turn without looking for pedestrians.

But it's worse. Look to the right. There's a second traffic light showing green. Cars driving a downgrade are encouraged to make the turn as fast as possible (the tapered corner doesn't help), at the expense of the pedestrians. Want to cross? Wait until a red light. Although it's not like that will even help that much: cars can still take a right on red (after "stopping").

What could be changed to make this intersection safer?
  1. The once-you've-turned light should be removed or relocated. Right now it is too far around the curve. By the time a driver sees it in its green phase, they are already crossing the crosswalk. In its red phase, a driver who had missed the main signal would have already crossed the crosswalk. It could be replaced with a "yield to pedestrians in crosswalk" sign.
  2. The walk signal should be changed to display a "walk" sign with every green phase of the light. This will allow for safer pedestrian movement and will not relegate pedestrians to play second fiddle to automobiles at this intersection. It could be enhanced with conspicuous "yield to pedestrians in crosswalk" signage.
  3. At slightly more cost (the first two items would simply require reprogramming or removing the lights) the curb should be bumped out to create more of a right turn movement. This will require vehicles to slow down as they make the turn to cross the crosswalk, which will allow them to better look for pedestrians crossing from one side of the roadway to the other.

This is traffic calming at its simplest: traffic throughput will not likely be curtailed (the bottlenecks in this intersection are not due to this light, but are at other locations) and it would significantly enhance conditions for more vulnerable road users.



Wednesday, April 9, 2014

Autopilot and self-driving cars

Every now and again I come upon a self-driving car (or fully automated vehicle, or FAV) puff piece. Here's Robin Chase—of the Cambridgeport Chases—talking about how we'll have fully automated vehicles zipping around and shuttling us places in a matter of years. Here's the AtlanticCities talking about the steps that will be taken to give us FAVs in a very matter-of-fact way. Look, Google has one, right here! And Bridj (a press-grabbing start-up about which I am a tad skeptical—that's for another day) predicts we'll have shared, automated vans carting us around in no time. Won't it be great when we're all driving FAVs?

I'm skeptical. The main premise of four wheels and an internal combustion engine is 110 years old and hasn't really changed. But technology is great, right? Surely it will solve this problem. Planes have autopilot, so why can't cars.

Because planes have pilots, too. Jim Fallows had a piece recently about "what autopilot can't do." Autopilot doesn't land planes, and in very adverse conditions, it can not compensate for things like gusts of winds from the side. The video he shows has pilots expertly guiding planes in at an angle, then straightening out just in time to touch down and not shear the wheels off. This is not something a computer program can do, because it requires a soft touch on the rudder—and knowledge that can't really be programmed. 99% of the time, autopilot is great. But 99% of the time isn't enough.

For FAVs, the same issue will arise. Sure, 99% of the time, a fully automated vehicle will do fine. And, yes, perhaps there will come a time when FAVs are allowed to be operated on certain limited-access stretches of roadway. But while it's easy (well, not easy, but it's relative) to code a car for the same few situations that come up over and over again, it's a bit harder to solve the myriad issues that account for the other 1%, such as:
  • a patch of ice
  • a piece of debris
  • a bicyclist darting out between two cars
  • a pedestrian jaywalking
  • the proverbial child running after the bouncing ball
Autopilot for airplanes is designed for the easy-to-solve portions of a trip: the set-it-and-forget-it parts. But it still requires two pilots to keep an eye on things. And that's on airplanes with triple redundancy built in everywhere. As long as cars ply public roadways and run on an ICE, they'll need to have a human paying attention to the road ahead.

Most situations can be automated and controlled for. But driving—especially in cities—is not easily automated given a myriad of uncontrollable factors. For those situations, the human brain still is, by far, the most effective tool.

The Pike Straightening in context

Last year, the state announced that it was going to straighten the Mass Pike in Allston. Everyone agrees this is a good idea: it's an aging structure, it includes far more grade separation than necessary, wider roadways than will be required for all-electric tolling, and a speed-limiting curve. The initial design last year left a lot to be desired: it doesn't change much of the area, and included big, sweeping, suburban-style ramps to move vehicles at high speeds from the Turnpike to Cambridge Street, and then funnels those vehicles in to the same godforsaken intersection with River Street and Western Avenue that already exists. Apparently it will be updated, but as stated now, it is a wasted opportunity.

This area represents a once-in-a-lifetime opportunity to engage major institutions and infrastructure to connect Boston in ways it has never been connected before. This page previously discussed the various related projects in the area. Harvard realized that a decade ago when they bought all the land underlying the area (MassDOT retains full easements). But there are several facets where a long-range outlook for the area would allow massive redevelopment, a new, transit-oriented housing and employment hub, and dramatic improvements to traffic flow to boot. While little of this may come to pass early on, it is important that construction that does take place does not preclude such improvements in the future.
Image from this post. Read the whole thing.

I'm not the only one who thinks this. David Maerz has a great graphic about how Storrow Drive could merge in and out of the Turnpike, and off of the river, and it's a huge step in the direction I'm thinking. I assume we came up with these on our own; it's the right thinking. Hopefully we can convince the state to go in this direction as well.

The long and short of it is that while the project scope may be limited now, nothing should be constructed to preclude future development. The worst thing that could happen would be a highway engineer's dream ramps, speeding traffic along swooping elevated highways. That may work fine 25 miles outside the city, but it would represent a lost opportunity in Allston.

Decongestion:

While traffic on the main trunk of the Turnpike (100,000 vehicles per day) flows reasonably well, the same can not be said for the ramps leading on and off (30,000 per day). (Traffic counts here) All traffic is funneled through two toll booths (or in the parlance of the Turnpike, "Plazas") and subsequent sets of ramps. Most of it then goes through a bottleneck. Except for traffic to and from Allston, all traffic to/from Soldiers Field Road, Memorial Drive, Western and River Streets—and by extension Harvard, Central and Kendall Squares and beyond—runs through the intersection at Cambridge Street and the river. Thanks to a series of traffic lights and one-way streets, this ramp backs up to and sometimes through the toll plazas, and because of minimal throughput and merging, often creates delays of 15 minutes or longer. For traffic coming from Cambridge and Storrow Drive, there are similar delays as traffic has to run across the intersection outbound. This ties up in both directions for most busy times of the day.

In addition, these ramps create a horrid environment for cyclists and pedestrians. A relic of 1960s-era planning, Cambridge Street was built like a highway, and pedestrians and cyclists have to cross high speed ramps and then navigate an intersection with long light cycles and few, if any lane markings. Straightening the turnpike without addressing these shortcomings would be a major failure.

Example of a more efficient vehicle route.
Looking further out, however, there is ample opportunity to create additional entrances and exits from the Turnpike, and pull the congestion out of this area. For instance, a set of ramps further west in Brighton would allow traffic from Harvard Square and Fresh Pond Parkway to use the Eliot Bridge and avoid the Turnpike all together. This would remove traffic from this intersection, and reduce travel distances overall. It would also allow better highway access to the New Balance development in Allston, and several neighborhoods which border the Turnpike but do not have nearby highway access. Changes like this are not necessarily directly wihtin the project scope, but they are so intertwined that they should be analyzed along with the straightening itself.

A extension of the street grid (see next section) through the area would also help with congestion, and allow better access to the BU property bordering the rail yard.

Bicycle facilities in yellow:
  • Solid: existing
  • Dashed: under construction
  • Dotted: planned/proposed

Potential highways in orange
Potential green space in Green
Potential street grid in white
Street Connectivity

Allston is currently a black hole for getting from one side of the world to the other. From Boston University to Harvard Square on a bicycle, your options are to use the BU Bridge or Harvard Avenue and the Cambridge Street overpass or a derelict pedestrian bridge. Options by foot or by vehicle are not much better. While concepts include a street grid generally along and north of Cambridge Street, there is the opportunity to connect the streets south to Boston University and Commonwealth Avenue. These would increase bicycle and pedestrian mobility as well as easing the current gridlock at the nearest crossings of the turnpike east and west of the Allston Yard, at the BU Bridge and Harvard Ave/Cambridge Streets. Entrances and exits from the Turnpike would allow for far better connections across this current hole in the system. It would also provide links between much of Boston's bicycle network, which is one of the premises of the People's Pike.

Development

One huge issue in Boston is a lack of affordable housing. Housing in Allston, Brighton, Cambridge and the surrounding areas is accessible to jobs by transit and to the nearby universities. The Allston plot happens to be right in the center of three schools: within a mile of BU, Harvard and MIT. While Harvard owns the land, it could provide housing for all three schools, as well as for the population in general. High-priced riverfront housing (especially if the roadways were pulled away from the river) could help to subsidize construction with less lofty views, but still a great location nearby thousands of jobs and educational facilities. Would this be a complete panacea to the housing issues in Boston? Probably not. But the land would be available to add thousands of housing units, many of them owned by colleges for student housing, which would free up some demand in nearby neighborhoods and stabilize prices. It would also provide an area which area which could be very well connected to transit for commercial development as well. By depressing as much infrastructure as possible and decking over it, a large, open area could be available for development.

Parkland


Potential route for Soldiers Field Road
away from the river and new parkland
Right now, the Charles River is lined with roadways for five solid miles from Boston the Eliot Bridge and beyond. On the Boston side, Soldiers Field Road and Storrow Drive leave little room for bicycle and pedestrian facilities between the river and the roadway. In addition, Harvard's Business School campus is cut off from the river by the roadway, and the advantages of a beautiful riverfront campus are denuded by a four-to-six lane highway. Harvard is obviously a major stakeholder here, but if they were amenable, the highway could be routed west of their campus and the Stadium. This would, if anything, shorten the length of the roadway, and for Harvard, instead of decking over part of Soldiers Field Road, they would have a direct link to the river.

The change would be dramatic. The current underpasses at Western, River and Harvard could be repurposed for bicyclists (a goal of the Charles River Conservancy and many bicycling and pedestrian activists) saving millions of dollars and achieving a goal for the DCR plans along the river. It would also create one of the best riverfront parks in the country. It would increase the value of real estate near the river. In the 1930s to 1960s, we paved along most of our riverfront. This would be a great opportunity to take it back.

Transit


Existing (solid) and potential (dashed) transit.
New stations shown.
Finally, this area is currently reasonably well-connected to the transit system, but it could be dramatically better connected. The state's 10 year transit plan shows DMUs operating from a "West Station" in the Allston yard area to both North and South stations. This is a fine start. But the opportunities here are endless. Currently, there is a drastic demand for travel between Cambridge and the Fenway/Allston/Brookline/Longwood areas. The 1 and 66 are the top two bus routes the MBTA operates, and the M2 runs from Harvard to Longwood ever 5 to 10 minutes at rush hour, and frequently all day. If there were a better connection, it would be great for jobs access and congestion reduction. And buses currently skirt the Allston area, but better connections would certainly improve the situation.

So a first step would be the DMUs between Allston and the downtown terminals. Further along, the line through Kendall could be improved to allow more frequent service and transit-level service could be provided between 128 and North and South stations, serving the high-density Newton-Brighton corridor and adding more transit choices for commuters along the Turnpike, easing congestion further (and pulling off enough demand to, say, eliminate Storrow Drive west of the Bowker overpass).

In the long run, however, the Allston area provides a dramatic link between Harvard Square and Kenmore and points south. When the Red Line was relocated in the 1980s, the former yard leads to the Cabot Yards (now the Kennedy School) were maintained—the tunnels exist to this day, curving from the Red Line tracks parallel to the bus tunnel. The right-of-way is maintained through the campus (a conspicuous gap between buildings) to the river. While tunneling would be expensive, this is a transit corridor that could connect to Allston (via North Harvard Street) and then across Allston. An initial corridor could connect to the B Line on Commonwealth Avenue via the BU campus, with a connection at the "West Station." Further along the line, it could be extended (via tunnel—expensively) through the Longwood Medical Area and Melnea Cass Boulevard to the Andrew or Columbia stations, creating the opportunity for a true Urban Ring. Since it connects with the Red Line on both ends, it could use the Red Line rolling stock (which has higher capacity than other MBTA equipment).

Obviously this is a decades-long plan, but the transitway could be at least roughed in in the Allston area (and maybe connected to the Green Line which could have a short A-Allston branch extending in to the Harvard campus) with provisions added for extensions in both directions. Again, this is a once-in-a-lifetime opportunity with basically a blank slate, and it's much cheaper to build a box now than dig a tunnel under already-built infrastructure.

A lot of these steps are long in the future. However, there is no reason we should construct something now which will preclude this potential in the future.

Saturday, March 29, 2014

Red-Blue connector: think outside the tunnel

We recently wrote about the obscenely inflated cost of the Red-Blue Connector. And while the underground costs are certainly inflated, it still involves building a tunnel underground, in loose fill, under a busy street, and then building connections in to an existing station. It would still involve months- if not years-long lane closures, massive utility relocation, and underground station construction. It might be heretic to say so, after Boston has mostly removed above ground transit, but in this case, an elevated solution might be the best solution possible, and not just because it would be cheaper (which it would be).

First, the logistics. The Blue Line tunnel currently ends several blocks east of Bowdoin Station. The original portal was between Joy and Russell Streets (at Nims Square, one of Boston's lesser-known squares). Here's an aerial photograph of the portal; you can see that it is several blocks east of the curve at Bowdoin Station. Most likely, the tracks were capped just east of Joy Street, and the portal filled with dirt and built over. Most likely, it still exists.

And most likely, it could be easily opened. The cheapest option would be to run the Blue Line straight down the center of Cambridge Street at grade, but for a litany of reasons that, uh, wouldn't work. But instead of coming up from underground and flattening out, it could continue sloping upwards and, by Blossom Street, enter an elevated guideway above Cambridge Street. From there, it would continue a few hundred feet and terminate at a two-track station with a center platform above Cambridge Street, adjacent to the current Charles Station.

Click the diagram below to enlarge. All lines are to scale.



There are many, many advantages to an elevated solution. They include:

• The portal exists! There may be some utilities buried there, but not likely major infrastructure; it's probably mostly just fill.

• The portal is built in to the side of Beacon Hill. As the tunnel rises to the surface, the surface falls away. This limits the space that a ramp takes up for the transition from underground to elevated. In addition, because the Blue Line does not require overhead wiring, the tunnel height is lower—and therefore the floor is higher—reducing the amount of climb necessary. A similar subway-to-elevated transition exists for Green Line trains between North Station and the Lechmere viaduct. The distance between the portal and where the viaduct passes over the ramps from the Leverett Circle is conveniently the exact same distance as from Joy Street to Blossom Street on Cambridge Street.

• Once above the street, the viaduct will be quite narrow. Since the East Boston tunnel was originally built for streetcars, Blue Line cars are narrower than, say, Red Line cars. The elevated portion of the Green Line between North Station and Lechmere—especially the new section east of Science Park—is a good guide to the width, although with no need for overhead wire, a Blue Line viaduct could actually be built narrower than the Green Line.

• Charles Station could be built to serve the Blue Line with no added mechanical equipment, and minimal changes to the station. There are already wide stairwells, escalators and elevators in Charles Station which bring passengers from street level to the Red Line. The Blue Line would simply be a platform accessible from the current outbound platform, and would not require any additional infrastructure. Unlike other transfer points in downtown Boston, Charles Station was recently rebuilt, and passages are wide enough for significant additional traffic. An underground station, with additional elevators and escalators

• An elevated Charles Station would require transferring passengers to climb and descend fewer stairs than an underground solution. Imagine a round trip from Cambridge to East Boston. For an underground station, passengers would arrive on the Red Line, descend to street level and then down to the underground, reversing the trip on the way back for a total of four flights of stairs. For an elevated solution, the morning would require two flights—down to street level to cross under the Red Line and then back up—but the evening would be a level transfer, halving the vertical distance each passenger would have to travel.

• While Cambridge Street abuts the historic Beacon Hill neighborhood, it is generally bordered by newer construction, and in many cases by parking lots. The street runs east-west, so most of the shadows cast by an elevated structure would fall on the north side of the street, which is mostly occupied by Massachusetts General Hospital, and in several cases by parking facilities. As a major beneficiary of the project, MGH would likely be willing to have some shadows cast in exchange for far better accessibility. In addition, Cambridge Street already has an elevated structure at Charles Circle, so it is not an entirely new concept to have overhead transit in the area.

• A fire station would likely have to be relocated from the south side of the street between Russell and Joy Streets as they would no longer be able to take left turns across the subway-elevated transition. However, it could be moved to parking facilities on the other side street near MGH, and integrated in to new construction. For instance, a fire house occupies the ground floor of a skyscraper in the Financial District.

• Elevated construction and stations are far less expensive to build than underground. And far less distuptive. While an underground structure would require years of lane closures on Cambridge Street, an elevated structure would require only supports to be built in ground—and those would be in the median. Most of this work—exploration, utility relocation and the pouring of the concrete—could take place outside of rush hours, and the actual viaduct could be built off-site and placed on the pedestals, with minimal interference with local traffic. If the area can survive a three-year closure of the Longfellow Bridge, it could deal with a few short-term lane restrictions.

At $100 million per mile, the elevated section would cost less than $50 million to build. Since the station would be little more than a concrete slab between two tracks—no need to install multiple elevators, escalators and fare control—it would not appreciably add to the cost. It's entirely possible than an elevated solution could be built for under nine figures, far, far less than the state's estimate for an underground connection.

• This project would require few—if any—property takings. The only street-level construction would be supports for the elevated, and these could be built in the existing median on Cambridge Street. Again, the supports for the Green Line connection between Science Park and North Station is a good case study; the base of the concrete pedestals are only five feet wide.

Building a Red-Blue connector is something which would dramatically enhance Boston's transportation network. It would increase ridership, reduce congestion downtown, and provide better employment access for a large part of the area. It would also utilize the only portion of the downtown network which is under capacity—the Blue Line—and allow it to better serve the traveling public. And while the state may be set on inflating the price to high that it will never be built, a compromise solution using as much existing infrastructure as possible could be built more quickly and far less expensively. It is a solution the city and state—and stakeholders in the area—should seriously consider.

Friday, March 28, 2014

Red-Blue Connector: It costs how much?

The Commonwealth of Massachusetts is supposed to build a connection between the Red and Blue lines. But they really, really don't want to. It's probably a very good idea, since it will increase mobility for Blue Line riders accessing jobs in Cambridge. And it will take some of the capacity crunch off the core subway lines where Red-Blue transfers take place. And it will improve access to Logan Airport. And it will shorten trips for thousands of commuters each day who will no longer have to transfer twice, in already-crowded downtown stations. There are definitely benefits. And the state is supposed to build it.

They're doing their best not to. They've claimed that the construction would cost $750 million, which has been called "deliberately high." How deliberate? The costliest subway project in the country—the Second Avenue Subway in New York—costs 1.7 billion dollars per mile. The Red-Blue connector is 1500 feet long. Less than a third of a mile If you do the math, it comes in at $2.7 billion. That's not even in the ballpark. It's an obscene figure and is risible. It shows the state does not want to come close to making a good-faith effort to support this transportation connection.

How much would it cost? Well, likely far less. The current Blue Line tunnels extend underneath Cambridge Street to a former portal at Joy Street. Continuing the tunnel would certainly be disruptive, but could be done in a cut-and-cover method without fully disrupting traffic flow (the street is five lanes wide including the median, and the subway would only require two). Utilities would require movement, but there would be no need to support an elevated roadway or surface train lines above (like the Big Dig). Traffic on Cambridge Street would suffer for a time, but better transit service in the end would be worthwhile. Alon Levy has a compendium of subway construction costs, and most projects fall under $1.5 billion per mile.

A good analog might be the Central Subway in San Francisco. It's a short extension of a light rail-sized transit line (as is the Blue Line; the East Boston tunnel was originally built for streetcars so it's a much smaller gauge than, say, the Red Line) extending to a terminal station in a dense city. It is budgeted for $800 million per mile. If the Red-Blue Connector was built for the same cost, it would come in around $250 million. Or a third of the cost the state estimates.

The $750 million figure is not disingenuous. It's a lie. And an elevated connection—with only a few hundred feet of elevated structure—could be built for a fraction of the cost with a better final product, to boot.

Monday, March 10, 2014

Crosby's Corner: something to like for cyclists

If you drive out Route 2 like I did this weekend (twice, because I misremembered the date for a ski race), you'll notice some construction near the border of Lincoln and Concord. This is Crosby's Corner, and it's an example of a highway project which will likely benefit all users, and which is the right kind of construction to do in this day and age. It's always a breath of fresh air to remember that MassDOT secretary Rich Davey has said that we're not building any more highways. But it's the right policy: fix and streamline what you have so that it serves the people who use it.

So, Crosby's Corner. It's the second light on Route 2 past 128, where, going outbound, you come down a hill and take a left. It's certainly not what you'd think of being a safe design, but it dates from the 1930s when there was far less traffic than today. Now it is a backup-causing bottleneck (one of several on Route 2) and probably the most dangerous intersection on the road. Outbound, there's the left turn light at the bottom of a hill. Inbound, there's a sharp right at the bottom of a hill and then a left-hand merge with no merge space. There have been some pretty horrendous accidents, and it is only a matter of time until the next one.

The plans for improvements are generally good. A few houses were taken for the construction, which will take up more space than the current roadway, although it won't feel like a superhighway interchange. What excites me most, however, is that for the first time in nearly a century, bicyclists will be able to get from Route 2A to Sandy Pond Road, filling a major gap in the cycling network.

Some of the best bicycling in the region is north and west of Boston. Once you get past 128, the rolling country roads of Lincoln, Concord and beyond are a cyclists dream: they're too narrow for high speed driving, and twisty enough that (for the most part) they don't form direct enough routes to be amenable for through traffic. The one downside is Route 2: while there are some crossing points, there are several areas where access is, for all intents and purposes, limited to cars. (Route 2 is not a limited access freeway, and bicycling would be technically legal, but it would be extraordinarily dangerous.)

I will admit that the Crosby's Corner area is not currently, nor will it ever be, a major bike commuting corridor. But it will connect Sandy Pond Road, a beautiful, low-traffic roadway, to 2A, a more heavily-used thoroughfare, but one with enough of a shoulder to be amenable to cyclists. On my evening summer rides, I often face the question of cutting across Route 2 on Bedford Road, or adding 6 miles to my ride to head out to Concord center, and then back on Route 126. Taking Sandy Pond Road would be great, but would require a 100 yard ride on and then left turn across Route 2, unfeasable even over such a short distance. The new plans will allow cyclists to cross under Route 2 and then take a somewhat roundabout route to Sandy Pond Road. While the current plans don't mention it, a short cycletrack-like path from Sandy Pond Road along the Route 2 shoulder would better facilitate bicycling movements. This should be a goal of the project, as it would be an inexpensive way to work in dramatic bicycle improvements for a $60 million highway project.